Eastern Leighton Linslade Urban Extension

Eastern Leighton Linslade Urban Extension Project Images
Eastern Leighton Linslade Urban Extension Project Images

Staff within the practice have been involved with the project from its inception as a proposal for strategic growth in 2003 through to the recent approval of outline planning applications. The extension accommodates 2,600 dwellings with mixed use centres, extensive areas of formal open space and country parks.  Most recently, Built Form Resource has been involved in detailed negotiations on street design, parking strategies and inclusive mobility, crucial to the approval of the scheme.

Initial work involved an assessment of the whole town within its landscape setting, the form and structure of the town and the facilities and services it contains.  The aim of the assessments was to identify the directions for growth that minimise impacts on landscape and make the most of the assets within the town.  The range of work included:

  • Sustainable town study
  • Green Belt study
  • Detailed study of the town centre
  • Master plan
  • Framework Plan adopted by the local authority
  • Public consultations
  • Outline applications
  • Landscape and heritage assessments for EIA

Key issues in the development of the proposals include the recycling and remediation of quarry land for development, incorporation of a narrow gauge railway, coordination between different land owners and landscape sensitivities.  Associated work included landscape character and visual impact assessment of a large, single wind turbine, now constructed and operating.